Construction

Current and Upcoming Projects:

  • Culvert Replacement, various locations
  • HMA overlay, various locations
  • Sealcoat, various locations
  • Bridge Replacement, 155th St.
  • Bridge Replacement, N. Isett Ave.
Download the five-year construction program map (PDF).





  1. 155th St (F70) Reinforced Concrete Box Culvert Replacement

    Beginning Aug. 26, 155th St. (F70) will be closed to traffic for a reinforced concrete box culvert replacement and grading project. The closure will be from Elder Ave to Eliason Ave. Construction is anticipated to take 2-3 months, weather dependent. Read On...
  2. N. Isett Ave Reinforced Concrete Box Culvert Replacement

    Beginning August 20th, 2019 N. Isett Ave between house numbers 1571 and 1589 will be closed to traffic for a reinforced concrete box culvert replacement and grading project. Construction is anticipated to take 2-3 months, weather dependent. Read On...
  3. Bancroft Ave (X30) HMA Overlay

    Beginning August 14th, 2019, portions of Bancroft Ave (X30) between State Hwy 6 and Cedar County Line will be under construction for a HMA maintenance project. Construction is anticipated to take 1-2 weeks, weather dependent. Read On...
  4. Kelly Ave HMA Overlay

    Beginning August 9, Kelly Ave (X46) between State Hwy 6 and 155th St (F70) will be under construction for a HMA maintenance project. Traffic control will consist of a lane closure with flaggers and a pilot car. Read On...